PRECAST CONCRETE MANHOLES
• The structure round or square must be large enough to accept the maximum size pipe • The structure size is a function of the number size elevation and entry angle of pipes connecting to the structure • The structural integrity must be maintained by providing a minimum structural leg of concrete between pipe holes A